Inspection Guidelines

Electrical Upgrades to Single Family Dwellings 
A permit is required to perform all electrical upgrades, and the permit must be displayed and visible from the street.

When upgrading a home from non-grounded to grounded receptacles, or when installing a new or larger capacity main service panel, the entire electrical system must be brought up to the current code. In all cases, an inspection* is required before power is restored to the structure. Please contact our Building Officials Office at 843-863-5213 for additional information regarding current codes or for questions.

Re-Roofing a Single Family Dwelling 
A permit is required for any roofing work performed by a contractor, and the permit must be displayed and visible from the street.

  • Contractors are required to remove all roofing debris from the site
  • No inspections are required

Please call the Building Officials Office at 843-863-5213 for additional code requirements or if you have any questions.

Obtaining a Natural Gas Meter from SCE&G 
The City of Goose Creek requires a pressure test to be performed on gas lines before the local utility company is able to set the gas meter. This pressure test* ensures that the system is not leaking gas into or under the home or business. Please contact the Permitting Office for further information.